1, due to the machine twisted large, it is recommended that the machine is installed on the basis of concrete, embedded on the basis of embedded welding pieces for installation, the basis of depth and area calculated separately according to soil conditions, the proposed basis weight roughly machine weight 3 times the size of the machine installation, see the base map. 2, after installation in place, should check whether the gear reducer size shift, tank and large bucket gap is consistent, adjusted after the machine fixed welding on the basis of. 3, should be added lubricating oil, adjust the oil level, generally take 50% of the axis below the center is appropriate. 4, the machine is installed and adjusted properly, the test run, no-load test should be achieved: ① continuous operation for 2 hours: ② all solid parts should be solid, no loose phenomenon: ③ reducer, gear box without abnormal sound. 5, load test In addition to no-load test requirements, but also meet the following requirements: ① feeding, the material can not be a strong impact on the tank, not allowed to partial loading and filling the tank filled, so as not to damage the bucket and the body: ② to the maximum material to meet the design requirements.
|